Heavy structural framework installation for an industrial logistics hub, involving complex rigging and alignment.
Arabian Pearl Engineering was awarded the contract for the structural steel erection of a major industrial logistics facility. The project involved the assembly and lifting of over 1,200 tons of structural steel components, including primary columns, roof trusses, and mezzanine floors.
Utilizing high-capacity cranes and a specialized rigging team, we ensured the safe and precise placement of every structural element. The project was executed with zero lost-time incidents, highlighting our commitment to safety in complex lifting operations.
We provide end-to-end solutions for industrial fabrication and erection, from design to final inspection.
Get in Touch